Installation And Precautions Of Pharmaceutical Packaging Machine

Dec 10, 2023 Leave a message

1. Full-time personnel training operation and maintenance.
2. The ground wire should be connected to the designated position of the landmark plate.
3. The machine should be kept clean and tidy.
4. Before the production of the machine, all parts must be refueled (refer to the operation provisions).
5. When the machine leaves the factory, the gearbox strap must be lubricated, and oil must be added before production.
6. It is proposed that this machine should use an oil-free air compressor.
7. The pressure of molding, heat sealing, indentation and other parts should not be too large, otherwise the service life will be affected. The shape pad of the forming indentation should leave about one millimeter of floating room.